{"id":42264,"date":"2025-03-23T08:37:00","date_gmt":"2025-03-23T08:37:00","guid":{"rendered":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/"},"modified":"2025-03-23T08:37:00","modified_gmt":"2025-03-23T08:37:00","slug":"bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km","status":"publish","type":"post","link":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/","title":{"rendered":"Bhopal Metro&#8217;s second- soil testing starts for blue line, 14 stations will be built in 13km"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div>\n<p><strong>Bhopal<\/strong><\/p>\n<p>The work of soil testing has been started for the construction of the blue line under Bhopal Metro. This testing is being done so that the foundation of pillars and metro stations can be strengthened. Tests are being done at many places to check the clay strength, ensuring that the ground is suitable for construction work.<\/p>\n<p><strong>Testing done in these places<\/strong><\/p>\n<p>    So far, soil testing has been done for pillars on the station and ITI-JK Road in front of Kushabhau Thackeray Convention Center (Minto Hall). This process will continue even further and testing will be done on the entire 13 km long route.<\/p>\n<p>The station at Kushabhau Thackeray Convention Center will also be built at a station Kushabhau Thackeray Convention Center. The Bogada Bridge (Interchange) section will be created as the 14th station. Where there will be an interchange of the orange line built between Karond Square to AIIMS and the blue line running between Bhadbhada intersection to Ratnagiri Tiraha.<br \/>Soil testing is happening in two ways. The first test is being held in places where pillars will be made. At the same time, the second test is being done under the metro station.<\/p>\n<\/p>\n<p>Soil testing is happening in two ways. The first test is being held in places where pillars will be made. At the same time, the second test is being done under the metro station.<\/p>\n<p>This will be a section where passengers will be able to get off one metro and ride in another. The part of Bridge Bogda is near Subhash Nagar to AIIMS (priority track). Therefore, work will be started soon on the interchange section. This is because the interchange section will have to be designed now.<\/p>\n<p><strong>Blue line will be built at a cost of Rs 1006 crore<\/strong><\/p>\n<p>Bhopal Metro Blue Line is being constructed at a cost of Rs 1006 crore. Under this project, a total metro line will be built in a total of 13 km length from Bhadbhada intersection to Ratnagiri Tiraha. This route will pass through many major roads in the city. So that traffic can be made smooth and sharp. 14 stations will be built on this blue line route.<\/p>\n<p><strong>Blue line will also have interchange section<\/strong><\/p>\n<p>An interchange section will be created on the Bogada bridge in the blue line of Bhopal Metro. This section will connect the orange line from Karond Square to AIIMS and the blue line from Bhadbhada to Ratnagiri. With the help of this interchange section, passengers will be able to get off one metro and easily catch another metro. The section near Bogda Bridge will be close to the priority track of AIIMS from Subhash Nagar.<\/p>\n<p>Two -way testing soil testing is being done in two ways. The first test is being held in places where pillars will be made. At the same time, the second test is being done under the metro station. Testing has been done for Pillar in front of ITI on Raisen Road and on JK Road. At the same time, testing for the station in front of Minto Hall was done on Friday.<\/p>\n<p>A total of 14 stations will be built for 14 stations blue line will be built at these places. These include Bhadbhada Chauraha, Depot Square, Jawahar Chowk, Roshanpura Square, Kushabhau Thackeray Hall, Parade Ground, Prabhat Square, Govindpura, Govindpura Industrial Area, JK Road, Indrapuri, Piplani and Ratnagiri Tiraha.<br \/><strong>Barricading has been done during clay testing. So that, there is no problem.<\/strong><\/p>\n<p>\n<strong>Soil test will be in two stages<\/strong><\/p>\n<p>Soil testing is being done in two phases for the construction of the metro. Soil testing for pillars: This is being done in places where metro pillars will be erected. This detects the strength of the land and the ability to bear the load. Soil testing for the metro station: This is being done in places where metro stations will be built. This testing is ensured that the soil structure is stable and strong.<\/p>\n<p><strong>When will the blue line be completed?<\/strong><\/p>\n<p>Construction work of Bhopal Metro&#8217;s blue line has started in 2024 and has been targeted to be completed by 2027. After the completion of this project, the city&#8217;s public transport system will become faster, efficient and convenient.<\/p>\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Bhopal The work of soil testing has been started for the construction of the blue line under Bhopal Metro. This testing is being done so that the foundation of pillars and metro stations can be strengthened. Tests are being done at many places to check the clay strength, ensuring that the ground is suitable for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":42265,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"https:\/\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg","fifu_image_alt":"","footnotes":""},"categories":[3],"tags":[],"class_list":{"0":"post-42264","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-madhya-pradesh"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bhopal Metro&#039;s second- soil testing starts for blue line, 14 stations will be built in 13km - News Timers<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bhopal Metro&#039;s second- soil testing starts for blue line, 14 stations will be built in 13km - News Timers\" \/>\n<meta property=\"og:description\" content=\"Bhopal The work of soil testing has been started for the construction of the blue line under Bhopal Metro. This testing is being done so that the foundation of pillars and metro stations can be strengthened. Tests are being done at many places to check the clay strength, ensuring that the ground is suitable for [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/\" \/>\n<meta property=\"og:site_name\" content=\"News Timers\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-23T08:37:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg\" \/><meta property=\"og:image\" content=\"https:\/\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1152\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"newstimers.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"newstimers.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/\"},\"author\":{\"name\":\"newstimers.com\",\"@id\":\"https:\\\/\\\/newstimers.com\\\/#\\\/schema\\\/person\\\/eedb09e776755c468967c45aea40c71d\"},\"headline\":\"Bhopal Metro&#8217;s second- soil testing starts for blue line, 14 stations will be built in 13km\",\"datePublished\":\"2025-03-23T08:37:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/\"},\"wordCount\":712,\"image\":{\"@id\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/thekhabars.com\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/22A_41-780x470.jpg?ssl=1\",\"articleSection\":[\"Madhya Pradesh\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/\",\"url\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/\",\"name\":\"Bhopal Metro's second- soil testing starts for blue line, 14 stations will be built in 13km - News Timers\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/newstimers.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/thekhabars.com\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/22A_41-780x470.jpg?ssl=1\",\"datePublished\":\"2025-03-23T08:37:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/newstimers.com\\\/#\\\/schema\\\/person\\\/eedb09e776755c468967c45aea40c71d\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/thekhabars.com\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/22A_41-780x470.jpg?ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/thekhabars.com\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/22A_41-780x470.jpg?ssl=1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/2025\\\/03\\\/23\\\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/newstimers.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bhopal Metro&#8217;s second- soil testing starts for blue line, 14 stations will be built in 13km\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/newstimers.com\\\/#website\",\"url\":\"https:\\\/\\\/newstimers.com\\\/\",\"name\":\"News Timers\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/newstimers.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/newstimers.com\\\/#\\\/schema\\\/person\\\/eedb09e776755c468967c45aea40c71d\",\"name\":\"newstimers.com\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/newstimers.com\\\/wp-content\\\/litespeed\\\/avatar\\\/eaeb390f9d988b6e37b361c9a0127b35.jpg?ver=1776602818\",\"url\":\"https:\\\/\\\/newstimers.com\\\/wp-content\\\/litespeed\\\/avatar\\\/eaeb390f9d988b6e37b361c9a0127b35.jpg?ver=1776602818\",\"contentUrl\":\"https:\\\/\\\/newstimers.com\\\/wp-content\\\/litespeed\\\/avatar\\\/eaeb390f9d988b6e37b361c9a0127b35.jpg?ver=1776602818\",\"caption\":\"newstimers.com\"},\"sameAs\":[\"https:\\\/\\\/newstimers.com\"],\"url\":\"https:\\\/\\\/newstimers.com\\\/index.php\\\/author\\\/newstimers-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bhopal Metro's second- soil testing starts for blue line, 14 stations will be built in 13km - News Timers","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/","og_locale":"en_US","og_type":"article","og_title":"Bhopal Metro's second- soil testing starts for blue line, 14 stations will be built in 13km - News Timers","og_description":"Bhopal The work of soil testing has been started for the construction of the blue line under Bhopal Metro. This testing is being done so that the foundation of pillars and metro stations can be strengthened. Tests are being done at many places to check the clay strength, ensuring that the ground is suitable for [&hellip;]","og_url":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/","og_site_name":"News Timers","article_published_time":"2025-03-23T08:37:00+00:00","og_image":[{"url":"https:\/\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg","type":"","width":"","height":""},{"url":"https:\/\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg","width":1920,"height":1152,"type":"image\/jpeg"}],"author":"newstimers.com","twitter_card":"summary_large_image","twitter_image":"https:\/\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg","twitter_misc":{"Written by":"newstimers.com","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/#article","isPartOf":{"@id":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/"},"author":{"name":"newstimers.com","@id":"https:\/\/newstimers.com\/#\/schema\/person\/eedb09e776755c468967c45aea40c71d"},"headline":"Bhopal Metro&#8217;s second- soil testing starts for blue line, 14 stations will be built in 13km","datePublished":"2025-03-23T08:37:00+00:00","mainEntityOfPage":{"@id":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/"},"wordCount":712,"image":{"@id":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg?ssl=1","articleSection":["Madhya Pradesh"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/","url":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/","name":"Bhopal Metro's second- soil testing starts for blue line, 14 stations will be built in 13km - News Timers","isPartOf":{"@id":"https:\/\/newstimers.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/#primaryimage"},"image":{"@id":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg?ssl=1","datePublished":"2025-03-23T08:37:00+00:00","author":{"@id":"https:\/\/newstimers.com\/#\/schema\/person\/eedb09e776755c468967c45aea40c71d"},"breadcrumb":{"@id":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/#primaryimage","url":"https:\/\/i0.wp.com\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg?ssl=1","contentUrl":"https:\/\/i0.wp.com\/thekhabars.com\/wp-content\/uploads\/2025\/03\/22A_41-780x470.jpg?ssl=1"},{"@type":"BreadcrumbList","@id":"https:\/\/newstimers.com\/index.php\/2025\/03\/23\/bhopal-metros-second-soil-testing-starts-for-blue-line-14-stations-will-be-built-in-13km\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/newstimers.com\/"},{"@type":"ListItem","position":2,"name":"Bhopal Metro&#8217;s second- soil testing starts for blue line, 14 stations will be built in 13km"}]},{"@type":"WebSite","@id":"https:\/\/newstimers.com\/#website","url":"https:\/\/newstimers.com\/","name":"News Timers","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/newstimers.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/newstimers.com\/#\/schema\/person\/eedb09e776755c468967c45aea40c71d","name":"newstimers.com","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/newstimers.com\/wp-content\/litespeed\/avatar\/eaeb390f9d988b6e37b361c9a0127b35.jpg?ver=1776602818","url":"https:\/\/newstimers.com\/wp-content\/litespeed\/avatar\/eaeb390f9d988b6e37b361c9a0127b35.jpg?ver=1776602818","contentUrl":"https:\/\/newstimers.com\/wp-content\/litespeed\/avatar\/eaeb390f9d988b6e37b361c9a0127b35.jpg?ver=1776602818","caption":"newstimers.com"},"sameAs":["https:\/\/newstimers.com"],"url":"https:\/\/newstimers.com\/index.php\/author\/newstimers-com\/"}]}},"_links":{"self":[{"href":"https:\/\/newstimers.com\/index.php\/wp-json\/wp\/v2\/posts\/42264","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newstimers.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newstimers.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newstimers.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newstimers.com\/index.php\/wp-json\/wp\/v2\/comments?post=42264"}],"version-history":[{"count":0,"href":"https:\/\/newstimers.com\/index.php\/wp-json\/wp\/v2\/posts\/42264\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newstimers.com\/index.php\/wp-json\/wp\/v2\/media\/42265"}],"wp:attachment":[{"href":"https:\/\/newstimers.com\/index.php\/wp-json\/wp\/v2\/media?parent=42264"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newstimers.com\/index.php\/wp-json\/wp\/v2\/categories?post=42264"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newstimers.com\/index.php\/wp-json\/wp\/v2\/tags?post=42264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}