Mumbai
A railway station is being built in the Thane area of Mumbai, which will have 11 floors. This railway station is being made not only in connectivity, but keeping in mind the entertainment of the people. There will also be malls, office spaces and retail shops above the railway station. This project will increase railway connectivity and will also create a big revenue for the government.
This project will be developed in the 9,000 sqm area near the platform 10A of Thane railway station. Along with this, there will also be a lease space of 24,280 sqm. This place can be given on a lease of 60 years. The project will be completed by June 30, 2026. Connectivity has been taken care of near this railway station, which will also be connected to the bus and metro.
What will be the facilities
Parking facility will be provided in the basement of railway station. Along with this, facilities of railway will also be provided here. The deck of the bus will be made from this, from where the local bus can be caught. All these facilities will be provided on the 2 floors below. The above floor will be used for commercial use. Shopping and retail shops will be built on these floors.
This railway station will not only promote connectivity, but will also provide facilities to the people. Food courts and restaurants will also be made on the above floor. There will be a gaming zone for children, while a big space is also being prepared for the office. Apart from the hotel and service apartments, a coaching institute will also be built on it.
Which places will be connectivity
In addition to the train, connectivity of other means will also be provided at this station. A 2.24 km elevated road will be built on this, which will directly connect the Eastern Expressway to the railway station. A deck will be made for bus movement from Platform 10, so that passengers do not have to get off the train and go far to catch the bus. This project is being made by Rail Land Development Authority and Thane Municipal Corporation.